24/7 07 4952 3444 35 Commercial Avenue, Paget QLD 4740 admin@abcheavy.com.au
ABC Heavy Engineering Request a quote
Induction hardening in progress on a rotating steel shaft, a glowing red heat band under the coil and quench mist
industries

ENERGY

Power station outage and shutdown support, relief operators and breakdown response, with the heat treatment, machining and fabrication that critical plant components require.

11 kV, the largest power capacity at PagetSwitchyard
3.3 kV for underground mining plantPower up before dispatch
200 kW to 400 kW at 3 to 10 kHzInduction units
Induction heating rig set up around a large drum component in the ABC workshop

OUTAGE WORK, AND WHAT THE COMPONENTS NEED

For power stations we provide outage and shutdown support, relief operators and breakdown response, along with the heat treatment, machining and fabrication that critical plant components require.

Induction units from 200 kW to 400 kW at 3 to 10 kHz harden wear surfaces to 60 HRC at case depths of 3 to 15 mm. The computerised gas fired oven, 6.5 m by 5.5 m by 2.7 m high and rated to 800 °C, handles stress relieving and normalising after heavy welding. Both are available commercially, not only to our own workshop.

Machining, fitting and painting then finish the component in the same building, and detailed QA packages can be provided with all completed work.

HEAT, POWER AND THE PAPERWORK

Switchyard
11 kV, the largest power capacity at Paget
Power up before dispatch
3.3 kV for underground mining plant
Induction units
200 kW to 400 kW at 3 to 10 kHz
Surface hardness
To 60 HRC, case depths of 3 to 15 mm
Gas fired oven
6.5 by 5.5 by 2.7 m high, to 800 °C
Oven processes
Stress relieving and normalising
Labour hire licence
LHL-01983-S5B8T, relief personnel and trades
Availability
Breakdown response 24/7, all repairs in house
ABC tradesman performing a quality-assurance measurement on a large machined circular flange in the Paget workshop

CREWS THROUGH THE OUTAGE, POWER UP BEFORE IT SHIPS

Power stations are named work for our Field Division. We supply shutdown and project crews, relief operators and breakdown response, and under Queensland labour hire licence LHL-01983-S5B8T we supply planners, supervisors, relief personnel and trades.

Our Commercial Avenue site holds the largest 11 kV electrical power capacity at Paget, with our own switchyard and a range of transformer capacities including 3.3 kV to power up underground mining plant, so heavy electrical plant is tested and commissioned here before it ships.

Field work carries the same QA documentation we apply in the shop, so what was measured on site is recorded and signed off.

RELATED WORK

  1. 01Induction Hardening & Heat TreatmentUnits from 200 kW to 400 kW and a computerised gas fired oven to 800 °C, available commer…
  2. 02MachiningShafts, housings and gear sets machined on plant taking workpieces to 150 t, with detaile…
  3. 03FittingMain machinery assemblies overhauled to OEM specification, with jacking presses rated to…
  4. 04Steel Fabrication & WeldingStructural repair and wear reclamation on critical plant, with submerged arc, TIG and MIG…

Put a job in front of us

Send the drawing, the failed component or the breakdown. Seven departments and the field division respond from one complex at Paget.

07 4952 3444 24/7 emergency call out Request a quote