ABC Heavy Engineering Request a quote
Crane hoisting a red propel gear case over a Marion 8750 dragline at an open-cut mine, ABC crew in hi-vis on the walking platform
ABC Heavy Engineering

PROJECTS

Crane hoisting a red propel gear case over a Marion 8750 dragline at an open-cut mine, ABC crew in hi-vis on the walking platform
Marion 8750 walking arm refurbishment
Project 01

Marion 8750 walking arm refurbishment

Walking arm refurbishment and propel gear case change out, every component cleaned, stripped, assessed, measured and recorded, refurbished back to OEM specification, crews working at height on the dragline in the open pit.

Asset
Marion 8750 dragline, walking arm and propel gear case
Site
Bowen Basin
Capabilities
fitting, machining, steel-fabrication-welding, induction-hardening, field-services

View case study

  1. 02BMA Peak Downs, six week ROM shutdown ROM (run of mine) plantBMA Peak Downs, Bowen BasinPrincipal contractor for a six week ROM shutdown.
  2. 03Coppabella, five years of monthly maintenance Site plant, monthly maintenanceCoppabella, Bowen BasinFive years of monthly maintenance.
  3. 04Marion 8750 propel gear case change outs Marion 8750 dragline propel gear casesBowen BasinPropel gear case change outs done on the machine, in place.
  4. 05In situ hoist and drag drum rebuilds Dragline hoist and drag drumsBowen BasinHoist and drag drum rebuilds carried out on the machine.

Client names are published only with written clearance. Jobs without a named client are listed by asset and region.